Global Pass Upgrades Added content from emails attached to ticket and sharepoint Pacth 01: inputs from email by Greg Patch 03: Created new section for subcloud group updated table 1 shared system configurations Patch 04: corrected typos (Mary's comments) Patch 05: solved merged conflict patch 06: removed broken link Story: TBD Task: TBD Signed-off-by: Adil <mohamed.adilassakkali@windriver.com> Change-Id: I60b0a40a60a44d30429cd3a4dd8374c16345951a
190 lines
6.9 KiB
ReStructuredText
190 lines
6.9 KiB
ReStructuredText
|
|
.. kad1593196868935
|
|
.. _performing-an-orchestrated-upgrade-using-the-cli:
|
|
|
|
=============================================
|
|
Perform an Orchestrated Upgrade Using the CLI
|
|
=============================================
|
|
|
|
The upgrade orchestration CLI is :command:`sw-manager`.
|
|
|
|
.. rubric:: |context|
|
|
|
|
.. note::
|
|
To use upgrade orchestration commands, you need administrator privileges.
|
|
You must log in to the active controller as user **sysadmin** and source the
|
|
/etc/platform/openrc script to obtain administrator privileges. Do not use
|
|
**sudo**.
|
|
|
|
The upgrade strategy options are shown in the following output:
|
|
|
|
.. code-block:: none
|
|
|
|
~(keystone_admin)]$ sw-manager upgrade-strategy --help
|
|
usage: sw-manager upgrade-strategy [-h] ...
|
|
|
|
optional arguments:
|
|
-h, --help show this help message and exit
|
|
|
|
Software Upgrade Commands:
|
|
|
|
create Create a strategy
|
|
delete Delete a strategy
|
|
apply Apply a strategy
|
|
abort Abort a strategy
|
|
show Show a strategy
|
|
|
|
You can perform a partially orchestrated upgrade using the CLI. Upgrade and
|
|
stability of the initial controller node must be done manually before using
|
|
upgrade orchestration to orchestrate the remaining nodes of the |prod|.
|
|
|
|
.. note::
|
|
Management-affecting alarms cannot be ignored at the indicated severity
|
|
level or higher by using relaxed alarm rules during an orchestrated upgrade
|
|
operation. For a list of management-affecting alarms, see |fault-doc|:
|
|
:ref:`Alarm Messages <alarm-messages-overview>`. To display
|
|
management-affecting active alarms, use the following command:
|
|
|
|
.. code-block:: none
|
|
|
|
~(keystone_admin)]$ fm alarm-list --mgmt_affecting
|
|
|
|
During an orchestrated upgrade, the following alarms are ignored even when
|
|
strict restrictions are selected:
|
|
|
|
- 900.005, Upgrade in progress
|
|
|
|
- 900.201, Software upgrade auto apply in progress
|
|
|
|
.. _performing-an-orchestrated-upgrade-using-the-cli-ul-qhy-q1p-v1b:
|
|
|
|
.. rubric:: |prereq|
|
|
|
|
See :ref:`Upgrading All-in-One Duplex / Standard
|
|
<upgrading-all-in-one-duplex-or-standard>` to manually upgrade the initial
|
|
controller node before doing the upgrade orchestration described below to
|
|
upgrade the remaining nodes of the |prod|.
|
|
|
|
- The subclouds must use the Redfish platform management service if it is an All-in-one Simplex subcloud.
|
|
|
|
- Duplex \(AIODX/Standard\) upgrades are supported, and they do not require remote install via Redfish.
|
|
|
|
.. rubric:: |proc|
|
|
|
|
.. _performing-an-orchestrated-upgrade-using-the-cli-steps-e45-kh5-sy:
|
|
|
|
#. Create a update strategy using the :command:`sw-manager` upgrade-strategy
|
|
command.
|
|
|
|
.. code-block:: none
|
|
|
|
~(keystone_admin)]$ sw-manager upgrade-strategy create
|
|
|
|
Create an upgrade strategy, specifying the following parameters:
|
|
|
|
|
|
- storage-apply-type:
|
|
|
|
|
|
- serial \(default\): storage hosts will be upgraded one at a time
|
|
|
|
- parallel: storage hosts will be upgraded in parallel, ensuring that
|
|
only one storage node in each replication group is patched at a
|
|
time.
|
|
|
|
- ignore: storage hosts will not be upgraded
|
|
|
|
- worker-apply-type:
|
|
|
|
**serial** \(default\)
|
|
Worker hosts will be upgraded one at a time.
|
|
|
|
**ignore**
|
|
Worker hosts will not be upgraded.
|
|
|
|
- Alarm Restrictions
|
|
|
|
This option lets you determine how to handle alarm restrictions based
|
|
on the management affecting statuses of any existing alarms, which
|
|
takes into account the alarm type as well as the alarm's current
|
|
severity. If set to relaxed, orchestration will be allowed to proceed
|
|
if there are no management affecting alarms present.
|
|
|
|
Performing management actions without specifically relaxing the alarm
|
|
checks will still fail if there are any alarms present in the system
|
|
\(except for a small list of basic alarms for the orchestration actions
|
|
such as an upgrade operation in progress alarm not impeding upgrade
|
|
orchestration\).
|
|
|
|
You can use the CLI command :command:`fm alarm-list --mgmt_affecting`
|
|
to view the alarms that are management affecting.
|
|
|
|
**Strict**
|
|
Maintains alarm restrictions.
|
|
|
|
**Relaxed**
|
|
Relaxes the usual alarm restrictions and allows the action to
|
|
proceed if there are no alarms present in the system with a severity
|
|
equal to or greater than its management affecting severity.
|
|
|
|
The upgrade strategy consists of one or more stages, which consist of one
|
|
or more hosts to be upgraded at the same time. Each stage will be split
|
|
into steps \(for example, query-alarms, lock-hosts, upgrade-hosts\).
|
|
Following are some notes about stages:
|
|
|
|
- Controller-0 is upgraded first, followed by storage hosts and then
|
|
worker hosts.
|
|
|
|
- Worker hosts with no instances are upgraded before worker hosts with
|
|
application pods.
|
|
|
|
- Pods will be relocated off each worker host before it is upgraded.
|
|
|
|
- The final step in each stage is one of:
|
|
|
|
**system-stabilize**
|
|
This waits for a period of time \(up to several minutes\) and
|
|
ensures that the system is free of alarms. This ensures that we do
|
|
not continue to upgrade more hosts if the upgrade has caused an
|
|
issue resulting in an alarm.
|
|
|
|
**wait-data-sync**
|
|
This waits for a period of time \(up to many hours\) and ensures
|
|
that data synchronization has completed after the upgrade of a
|
|
controller or storage node.
|
|
|
|
Examine the upgrade strategy. Pay careful attention to:
|
|
|
|
- The sets of hosts that will be upgraded together in each stage.
|
|
|
|
- The sets of pods that will be impacted in each stage.
|
|
|
|
.. note::
|
|
It is likely that as each stage is applied, pods will be relocated
|
|
to worker hosts that have not yet been upgraded. That means that
|
|
later stages will be relocating more pods than those originally
|
|
listed in the upgrade strategy. The upgrade strategy is NOT
|
|
updated, but any additional pods on each worker host will be
|
|
relocated before it is upgraded.
|
|
|
|
#. Apply the upgrade-strategy. You can optionally apply a single stage at a time.
|
|
|
|
.. code-block:: none
|
|
|
|
~(keystone_admin)]$ sw-manager upgrade-strategy apply
|
|
|
|
While an upgrade-strategy is being applied, it can be aborted. This results
|
|
in:
|
|
|
|
|
|
- The current step will be allowed to complete.
|
|
|
|
- If necessary an abort phase will be created and applied, which will
|
|
attempt to unlock any hosts that were locked.
|
|
|
|
After an upgrade-strategy has been applied \(or aborted\) it must be
|
|
deleted before another upgrade-strategy can be created. If an
|
|
upgrade-strategy application fails, you must address the issue that caused
|
|
the failure, then delete/re-create the strategy before attempting to apply
|
|
it again.
|